2003 |
FELLAR exceeds 4000 units manufactured of planetary gearboxes in different powers for wind power.
|
|
|
1996 |
FELLAR becomes the first Spanish industry designing and manufacturing planetary gearboxes for Gamesa G47, AE46 MADE AND MICON NM46 windturbines.
|
|
|
1993 |
FELLAR arrives to China establishing a Joint Venture with DONG FANG STEAM TURBINE WORKS for the manufacture of car transmission casings.
|
|
|
1992 |
FELLAR designs and manufactures for VALENCIANA DE CEMENTOS a new gearbox for the KLINKER ball mill, replacing the previous.
|
FELLAR and FLENDER sign a Technological and Commercial Cooperation Agreement for the design and manufacture of windturbine gearboxes.
|
|
|
1991 |
FELLAR redesigned to RENFE request a new transmission for the MITSHUBISHI 269 locomotive. More than 700 of these units were produced.
|
FELLAR designs and manufactures gear drives for machine-bucket wheel excavators (TAKRAF) for ENDESA As Pontes mine (A Coruña).
|
|
|
1990 |
FELLAR designs and manufactures gear drives for machine-bucket wheel excavators (Buckau WOLF) for UNION FENOSA in Campo la Feira mines (A Coruña).
|
|
|
1989 |
FELLAR signs an important contract with ENDESA for the design and manufacture of power drives and belt conveyors for KRUPP and WESERHÜTTE.
|
|
|
1982 |
ENDESA successfully tested FELLAR design of the reducer for driving the impeller of the BUKAU WOLF bucket wheel excavator.
|
|
|
1981 |
FELLAR designs and produces for ENDESA all the power transmission elements necessary for backhoe loaders, bucket wheel (BUCKAU WOLF) in As Pontes opencast.
|